The new wall and stairs are nicely done. I will later install railings on top of the...
6/2/11 10:02 AM
42
The former flagstone patio.
6/2/11 11:37 AM
43
Things are looking a little messy at this point.
6/2/11 11:39 AM
44
The old drain pipes are exposed. These sent east roof runoff to an outlet under the...
6/4/11 5:48 AM
45
The old flexible drainage pipes to be removed and one of the concrete drain boxes that...
6/4/11 5:52 AM
46
This is what happens when concrete is poured up against the siding and trim board. $3...
6/4/11 5:54 AM
47
Better tools and some planning effort will make a better patio.
6/6/11 9:03 AM
48
Harold mixed and poured the concrete for the footing for one set of new steps.
6/6/11 3:29 PM