Perhaps it can be shattered.
6/26/11 12:33 PM
66
No luck. We just have to chip away at the rock for hours.
6/26/11 12:37 PM
67
The middle of the rock is reduced to dust. The trench is complete.
7/1/11 7:26 AM
68
The plumber has placed the new gas pipe in the trench. Austin & I get to finish the job.
7/6/11 9:56 AM
69
The gas pipe is secured at the outlet end by rebar.
7/6/11 9:57 AM
70
The gas pipe is required by code to be lightning-isolated (nonconductive).
7/6/11 9:57 AM
71
It enters the basement through the first course of siding.
7/6/11 9:57 AM
72
The yellow plastic banner gets buried in the trench as a warning to future excavators.
7/6/11 11:55 AM