|
« | < | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | > | » |
The old flexible drainage pipes to be removed and one of the concrete drain boxes that will be part of the new system. | DSC_8575.jpg | 6/4/11 5:52 AM | 1600x1071px | 904kB | Original Image |
Photographer: Christopher P Day | Camera: NIKON D80 | Date: 6/4/11 5:52 AM | ISO: 400 | Exp. Time: 1/160s | Aperture: 6.3 | Focal Length: 18.0mm (~27.4mm) | Copyright: 2011 CPDay |