Upper Unit
(Click on any thumbnail image below to see a larger version)
May 30, 2003. I had to rush down to Harvey Cedars to meet the truck carrying this new futon and bunk for the upstairs 2nd bedroom. Several hours of lifting and assembly (allowing for Indonesian assembly directions) and it is ready for mattresses.
May 30, 2003. That's much better! The upstars toilet is back in place with a secure flange base and new wax seal. No more leaks/ no rocking.
May 20, 2003. Harvey Cedars Moving Co. Jackie and I moved the sleeper sofa from the Church Tavern house to the shore house. It had to hang over the tailgate for the trip over the George Washington Bridge.
May 20, 2003. 2nd floor living area gets more lighting and furniture.
May 20, 2003. Sofa sleeper from Church Tavern house finds its new location. Jackie is on-line.
May 20, 2003. Everywhere I look there is more work to do. Removing the loose 2nd floor toilet reveals significant wood rot from earlier water leaks.
Pre-closing. Eating area- main level
Pre-closing. Living area- main level
Pre-closing. Panorama of main level