CPDay / Greenwich
» walkway burns
Photos are in rough order. Click any picture to enlarge.
1
The work on the new walkway begins with Austin and a delivery of Item 4 base.
10/31/15 10:50 AM
1600x1071 (1.3MB)
2
Kyle is also helping by spreading the Item 4.
10/31/15 10:51 AM
1600x1071 (930kB)
3
We need to cover the roof drain pipe that I installed earlier.
10/31/15 10:52 AM
1600x1071 (1022kB)
4
At this point, we're ready for the flagstones.
10/31/15 4:13 PM
1071x1600 (999kB)
5
Here are some of the flagstones that we will use.
10/31/15 4:15 PM
1071x1600 (966kB)
6
This bed is tamped and almost ready
10/31/15 4:21 PM
1600x1071 (853kB)
7
A truck and an additional wheelbarrow will speed things up.
10/31/15 5:30 PM
1071x1600 (1.0MB)
8
Ready for the edge borders,
11/2/15 12:29 PM
1071x1600 (1.0MB)
9
Here, the steel edging and flagstones have been added.
6/12/16 3:08 PM
1600x1071 (1.0MB)
10
Austin welds the steel edging pieces together.
6/12/16 3:09 PM
1600x1071 (952kB)
11
These are the tools that Austin uses for this job.
6/12/16 3:15 PM
1600x1071 (893kB)
12
He likes the work and is happy with results.
6/12/16 3:17 PM
1600x1071 (934kB)
13
Mexican beach pebbles are added to the spaces between the flagstones.
5/29/17 2:50 PM
1600x1071 (1.0MB)
Total images:
13
| Last update:
5/30/17 8:01 AM
|
Go to CPDay pages
|
Help