Up CPDay / Greenwich » walkway burns

Photos are in rough order. Click any picture to enlarge.
DSC_1944
1
The work on the new walkway begins with Austin and a delivery of Item 4 base.
10/31/15 10:50 AM
1600x1071 (1.3MB)
DSC_1947
2
Kyle is also helping by spreading the Item 4.
10/31/15 10:51 AM
1600x1071 (930kB)
DSC_1949
3
We need to cover the roof drain pipe that I installed earlier.
10/31/15 10:52 AM
1600x1071 (1022kB)
DSC_1955
4
At this point, we're ready for the flagstones.
10/31/15 4:13 PM
1071x1600 (999kB)
DSC_1958
5
Here are some of the flagstones that we will use.
10/31/15 4:15 PM
1071x1600 (966kB)
DSC_1960
6
This bed is tamped and almost ready
10/31/15 4:21 PM
1600x1071 (853kB)
DSC_1963
7
A truck and an additional wheelbarrow will speed things up.
10/31/15 5:30 PM
1071x1600 (1.0MB)
DSC_1970
8
Ready for the edge borders,
11/2/15 12:29 PM
1071x1600 (1.0MB)
DSC_2108
9
Here, the steel edging and flagstones have been added.
6/12/16 3:08 PM
1600x1071 (1.0MB)
DSC_2110
10
Austin welds the steel edging pieces together.
6/12/16 3:09 PM
1600x1071 (952kB)
DSC_2113
11
These are the tools that Austin uses for this job.
6/12/16 3:15 PM
1600x1071 (893kB)
DSC_2116
12
He likes the work and is happy with results.
6/12/16 3:17 PM
1600x1071 (934kB)
DSC_2216
13
Mexican beach pebbles are added to the spaces between the flagstones.
5/29/17 2:50 PM
1600x1071 (1.0MB)

Total images: 13 | Last update: 5/30/17 8:01 AM | Go to CPDay pages | Help